Secsun Machinery

News
News

Beat the Heat: Essential Summer Maintenance Tips for Your SECSUN Excavator

Views : 865
Update time : 2025-05-16

    As temperatures soar and construction projects accelerate, proper summer maintenance becomes critical to ensure your SECSUN excavator operates at peak performance. Discover our expert-recommended strategies to combat heat stress, humidity, and heavy workloads, safeguarding your equipment’s longevity and productivity.

    1. Cooling System Overhaul

  • Summer’s extreme heat demands rigorous cooling system care:

  • Radiator Deep Clean: Remove dust and debris clogging fins (reduces cooling efficiency by up to 40%).

  • Fan Belt Tension: Ensure 10-15mm deflection under 10kg pressure to prevent slippage.

  • Pro Tip: Install SECSUN’s optional radiator mesh guard to block airborne particulates.


    2. Hydraulic System Protection

  • High temps accelerate hydraulic fluid degradation:

  • Oil Analysis: Schedule monthly viscosity checks (ideal range: 46-68 cSt at 40°C).

  • Hose Inspection: Look for cracks in sunlight-exposed lines – UV resistance drops 30% after 2 summers.

  • Night Operation Advantage: Recommend shifting heavy digging to cooler hours to reduce system strain.


    3. Lubrication Reinvention

  • Pivot Point Focus: Prioritize boom/slew ring lubrication – 78% of summer failures originate here.

  • Interval Adjustment: Increase greasing frequency by 25% during sustained >35°C operations.


    4. Electrical System Defense

  • Battery Care: Keep terminals corrosion-free with baking soda solution; check specific gravity weekly.

  • Sensor Shielding: Protect pressure/temperature sensors with SECSUN’s reflective thermal wraps.

  • Harness Check: Rodent activity peaks in summer – inspect wiring insulation for chew marks.


    5. Undercarriage Attention

  • Track Tension: Heat expands metal – allow 5mm more sag than winter settings.

  • Sprocket Rotation: Reverse every 500 hours to distribute wear evenly.

  • Mud Management: After rainy days, pressure-wash undercarriage within 24 hours to prevent corrosion.

    09086b04c97876ef5e8208992ef58ae.jpg

Related News
Read More >>
Brazilian Customer Plans More SECSUN Purchases in 2027 Brazilian Customer Plans More SECSUN Purchases in 2027
Nov .11.2026
SECSUN welcomes a returning Brazilian customer to review previous cooperation, explore machinery solutions, and discuss plans for increased equipment purchases in 2027.
SECSUN Welcomes Visitors on the Opening Day of CeMAT ASIA 2026 SECSUN Welcomes Visitors on the Opening Day of CeMAT ASIA 2026
Nov .03.2026
SECSUN welcomes visitors at CeMAT ASIA 2026 in Shanghai, November 3–6. Meet our team at Booth N3-E1 and explore new business opportunities.
SECSUN to Showcase Material Handling and Cleaning Equipment at CeMAT ASIA 2026 SECSUN to Showcase Material Handling and Cleaning Equipment at CeMAT ASIA 2026
Oct .26.2026
Meet SECSUN at CeMAT ASIA 2026 in Shanghai, November 3–6. Discover diesel and electric forklifts, a 7-ton lithium battery forklift, and floor scrubbers at Booth N3-E1.
SECSUN Successfully Concludes the 140th Canton Fair 2026 SECSUN Successfully Concludes the 140th Canton Fair 2026
Oct .20.2026
SECSUN Machinery successfully concludes the 140th Canton Fair 2026 in Guangzhou, showcasing forklifts, telehandlers and construction machinery while connecting with global customers and exploring future cooperation opportunities.